The Waterbeach New Town SPD provides guidance about how the new town, to the north-east of Cambridge, should be designed, developed and delivered.
Adoption of the Waterbeach New Town SPD
The Waterbeach New Town SPD was adopted by South Cambridgeshire District Council on 6 February 2019.
The adopted SPD is published in our document library.
Public consultation on the draft SPD took place from 14 September to 26 October 2018.