Skip To Main Content

How are we developing the plan?

Diagram showing the adopted 2018 Local Plans running 2013- 2031 and the next Local Plan starting in 2017 and extending to 2040 and possibly beyond

We are currently at an early stage in the development of the new Local Plan (see glossary), which will be prepared in stages over about four years. The diagram below shows the outline timetable that was included in the adopted Greater Cambridge Local Development Scheme 2018 (as updated 2019). The Local Development Scheme (see glossary) is a document we are required to produce which sets out our plan making timetable. At each stage we will check that the process is moving forward positively towards a new Local Plan and, if necessary, we will adjust the timetable.

Read more about how we are developing the plan:

Website feedback form

Was this web page helpful? (optional)
Do you require feedback from a member of the team? (optional)